Order dated 12.12.2012 in the matter of Petition for Determination & Apportionment of Rental Charges for Drawal of Power from BBMB 220KV Grid-sub-Station at Rohtak Road and Direction/Order dated 11.12.2007 passed by the Commission. |
12/12/2012 |
12/12/2012 |
|
Download (88.3 KB) |
|
|
Order dated 05.12.2012 in the matter of Petition under Section 86(1(b) and 86(1)(f) of the Electricity Act, 2003 in connection with the disputes and differences arising under the PPA dated 18.07.2008 between the Maithon Power Limited and BRPL. |
05/12/2012 |
05/12/2012 |
|
Download (159.63 KB) |
|
|
Order dated 05.12.2012 in the matter of Petition U/s 86(1)(b) and 861(f) of the E.A. 2003 in connection with disputes and differences arising under the Power Purchase Agreement dated 12.05.2008 between the Petitioner and Respondent No. 1 |
05/12/2012 |
05/12/2012 |
|
Download (197.4 KB) |
|
|
Order dated 04.12.2012 in the matter of Petition for Determination of Tariff for 1.00 MWp Grid Interactive Solar PV Power Project on the Rooftop of Thyagraj Sports Complex and 2.5MW Gas Turbine Power Project of Thayagraj Sports Complex. |
04/12/2012 |
04/12/2012 |
|
Download (101.12 KB) |
|
|
Order dated 27.11.2012 in the matter of Review Petition for clarification/reconsideration/modification/review/ withdrawal of directions under MYT Order dt. 13.07.2012 passed by Delhi Electricity Regulatory Commission on the MYT Petitions filed by DTL, IPG |
27/11/2012 |
27/11/2012 |
|
Download (152.6 KB) |
|
|
Order dated 26.11.2012 in the matter of Petition U/s 94 of the Electricity Act, 2003 for review of the order dated 26.08.2011 passed by the Hon’ble Commission in the matter of determination of tariff for the Petitioner (PPCL) for the year FY 2011-12. |
26/11/2012 |
26/11/2012 |
|
Download (273.1 KB) |
|
|
Order dated 26.11.2012 in the matter of Petition U/s 94 of the Electricity Act, 2003 for review of the order dated 26.08.2011 passed by the Hon’ble Commission in the matter of determination of tariff for the Petitioner (IPGCL) for the year FY 2011-12. |
26/11/2012 |
26/11/2012 |
|
Download (365.24 KB) |
|
|
Order dated 16.11.2012 in the matter ofPetition seeking modification in the figure of carrying cost as awarded by the Hon’ble Commission vide its order dated 22.09.2009 in the line with justification/along with basis and principle of computation or correc |
16/11/2012 |
16/11/2012 |
|
Download (109.12 KB) |
|
|
Order dated 12.11.2012 in the matter of Petition for approval of Terms & Conditions entered between NDPL-G & NDPL-D for purchase of entire capacity of Rithala Combined Cycle Power Plant being put by NDPL Generation. |
12/11/2012 |
12/11/2012 |
|
Download (130.48 KB) |
|
|
Order dated 12.11.2012 in the matter of Petition seeking adoption of Generic Tariff for Generation of electricity from Grid Interactive 25 kWp Solar PV Project at NDPL GTK Grid Sub-station, Delhi. |
12/11/2012 |
12/11/2012 |
|
Download (86.18 KB) |